Sealcoating Preparation:
SPRINKLER SYSTEMS – Must be shut off 24 hours prior to sealcoat application. Sprinklers may be turned back on 24 hours after project completion.
HOMEOWNERS are not required to be home day of project. If it is convenient, we can schedule during vacations, holidays, etc to avoid the inconvenience of not being able to use driveway for 24 hours.
COMMERCIAL CUSTOMERS Sprinklers must be shut off, all cars removed by 5am day of project. It is your responsibility to warn all tenants, employees, etc. of work being done. Be aware of your garbage pickup day, and shipping & receiving days, etc.
Included in Sealcoating Service:
Sealcoating After Care:
Foot Traffic – No foot traffic for a minimum of 12-18 hours
Vehicle Traffic – No vehicle traffic for minimum of 24 hours
Fertilizer – Please be aware that fertilizer will affect the quality of sealcoating, causing deterioration of the product. Keep fresh sealcoated surfaces clean of chemicals such as lawn fertilizers, oil, and gas.
High Humidity days – Take extra care when driving on fresh sealcoat, even after recommended dry time due to the fact that high humidity requires longer curing time and sealcoat can become scuffed with tire marks from sharp turning on fresh sealcoat.
PLEASE BE AWARE OF THE FOLLOWING:
There are certain environmental factors that may cause premature wear on sealcoat. SHADED DRIVEWAYS may not cure properly due to lack of sun, and/or being damp for long periods of time. Driveways with maple, evergreen, or any sap producing trees near them may also wear prematurely in certain areas due to the tree saps effects on the sealer. If overhanging tree branches cover parts of driveway, be aware that this causes a constant drip while trees dry from rain which can cause the sealer to fade in those areas. Shaded driveways and driveways that are covered by falling leaves in the fall are recommended to be sealed during summer months. This allows for the sealer to cure with the heat and sun, as well as avoiding leaf problems. Allow for extra dry and cure time on high humidity days. Areas on asphalt that normally hold water puddles tend to deteriorate more rapidly over time.